top of page


Project Success Story: Car Park Gas Detection for Riyadh Metro
How ATCO Solutions delivered a fully integrated carbon monoxide detection system across two Riyadh Metro car parks — engineered for continuous coverage and integrated with the stations' live BMS and fire alarm systems.
6 days ago


Project Success Story: Equipping Saudi Aramco's Ras Tanura Valve Workshop with Ventil Test Equipment
How ATCO delivered Saudi Aramco's first fully single-OEM valve workshop — equipping Ras Tanura end-to-end with VENTIL test, calibration, and repair equipment for safety relief, isolation, and tank breather valves, and winning the deal on lifecycle value instead of price.
Jul 20


Project Success Story: A Gas Detection Transformation
How ATCO Solutions replaced fragmented, paper-based monitoring with an AI-powered platform - eliminating production shutdowns and achieving full regulatory compliance.
Jun 4


Project Success Story: Automation Interface for Instrument Air Dryer Compressor
Discover how ATCO Solutions delivered a high-availability automation interface for instrument air dryer compressors using a Siemens S7-400H redundant PLC system. This project success story highlights how hot-standby redundancy, PCS7 SCADA integration, and standardized panel design enabled continuous operation, improved reliability, and seamless system control for critical plant infrastructure.
Mar 19


Project Success Story: Zamzam Water Fountain Drainage Treatment Automation
As millions of pilgrims visit Makkah during Ramadan, the reliability of critical utilities becomes essential to maintaining seamless services. This case study explores how a Schneider Electric M580 PLC-based automation system was implemented to ensure high-availability monitoring and treatment of drainage water from the Zamzam drinking fountains, supporting dependable operations within the Makkah Haram utilities infrastructure.
Feb 25
bottom of page
